top of page

Project no.3
Design and Construction of the following:-
-
Gully/Flood and Erosion control measures for the company’s Project site, Abuja
-
External drainage outlets(covering up to 240m in lengths)
-
62.4m*1.4m highly reinforced ring culvert at the Market main entrance and exit gates
-
3*3 @14m lengths double-cell box Culvert at Madalla, Zuba, F.C.T.

Image0395 - Copy

Image0421

Image0424
bottom of page